Product Q&A

« See More Q&A's

Jackie from Cincinnati writes

Do I need to drill through a step into my house or through the patio attached to the step and treat with Termidor SC?

Exiting my house, there is one step and then a patio. Should the step or patio be drilled incrementally to treat for termites? This is the back door and faces the southwest. Thank you.

Answer:

Yes, you should drill a hole 2" from the foundation wall (1/2" in diameter/18" deep) every 10-12" apart. You will be dispursing the same amount of finished soultion in the drilled holes as you will the trench around the structure. Termidor SC will be mixed at 3.2 oz per 4 gallons of water per 10 lineal feet (in trench or drilled holes). Please let us know if you need anything else.

Answer last updated on: 05/05/2015

Was this answer helpful to you? Yes No

2 of 2 people found this answer helpful.