Product Q&A

« See More Q&A's

Dan writes

How do I apply Dominion 2L Termiticide in block foundation?

Should each cinder block be drilled into each cavity (2 per block) or should be done every few blocks? Also once drilled how should Dominion 2L be used?

Answer:

When treating a block foundation, you should drill a hole in each void so there would be 2 holes per block.  The holes should be no more than 18 inches high.  Usually you want to drill on the second row of blocks high from the ground.  In addition to drilling the holes you should also trench and treat the outside foundation wall and the inside foundation wall if you have a crawl space.  After drilling the holes, you are supposed to apply 2 gallons of solution per 10 lineal feet into the blocks.  For filling trenches and drill holes going vertically into slabs, you should apply 4 gallons per 10 lineal feet.  Please let us know if you have any further questions.

Answer last updated on: 04/20/2011

Was this answer helpful to you? Yes No

2 of 3 people found this answer helpful.

Dominion 2L Termiticide

Dominion 2L Termiticide

5 out of 5 stars

$37.98

Free Shipping*