Product Q&A

« See More Q&A's

Danielle from Tucson, writes

How do you place the bait stations in areas with tile floors or concrete?

Termites sometimes come thru cracks.

Answer:

The Advance Termite Bait Station should be placed 2-4 feet away from the foundation, but not directly under the drip line from the roof of the structure. If there is tile or concrete in this area we recommend using a core drill as it should only take a few minutes per hole and also leaves a perfectly smooth, round hole and will also go through rebar as well.

Answer last updated on: 09/17/2015

Was this answer helpful to you? Yes No

5 of 7 people found this answer helpful.

Advance Termite Bait System Kit

Advance Termite Bait System Kit

4.5 out of 5 stars

$288.00

Free Shipping*