Product Q&A

« See More Q&A's

David writes

How long after applying Bora-Care with Mold-Care should I wait before painting or staining?

I just completed application of Bora-Care with Mold-Care to the interior of a small cypress barn that I built, and to the joist under structure. I plan to finish the wood with a white wash semi-transparent stain and a final coat of polyurethane. How long do I have to wait before applying?

Answer:

You need to wait 48 hours to let the Bora-Care with Mold-Care dry completely before you begin painting, staining or sealing the wood.

Answer last updated on: 04/08/2011

Was this answer helpful to you? Yes No

15 of 16 people found this answer helpful.

Bora-Care with Mold-Care

Bora-Care with Mold-Care

4.5 out of 5 stars

$129.98

Free Shipping*