David writes
I just completed application of Bora-Care with Mold-Care to the interior of a small cypress barn that I built, and to the joist under structure. I plan to finish the wood with a white wash semi-transparent stain and a final coat of polyurethane. How long do I have to wait before applying?
You need to wait 48 hours to let the Bora-Care with Mold-Care dry completely before you begin painting, staining or sealing the wood.
Answer last updated on: 04/08/2011