Brian from Smithfield, Va writes
Label says .5inches with in 14 days. is that correct?
Yes, the label is always correct. Prodiamine 65 WDG should be activated by at least 0.5 inch of rainfall or irrigation or shallow incorporation (1 to 2 inches) before weed seeds germinate and within 14 days following application
Answer last updated on: 03/18/2020