Kerri from Nutley, Nj writes
How long should you wait to turn on central air and or a wall unit air conditioner after perimeter treatment with Termidor SC? Additionally how long should you wait to return to sleeping in bedrooms that are below ground after perimeter treatment?
We recommend waiting until the Termidor SC treated areas have dried before turning on the units. As long as non of the application seeped inside, you can use the rooms as usual after the application.
Answer last updated on: 05/23/2021