Stanley from Santa Fe, Nm writes
We have a a 3.5 ft high crawl space above our ceiling in which vendors must crawl around in to install electrical power cords and other equipment during the quarterly installation of changing museum exhibitions. What is the amount of time necessary to wait before these workers can work in this crawl space after using this fogger?
The treated areas must be completely dry and ventilated prior to re-entry when the CB Pco Foggers. This typcially takes a few hours and then the area can be safely accessed as needed.
Answer last updated on: 08/09/2013