The bait for Trelona ATBS Annual Monitoring Stations should be replaced on an annual basis, or as needed due to environmental conditions. You can refer to the manufacturer's Installation & Service Guide (pg. 6) for more specific instructions for inspection and replacement intervals.
The Trelona ATBS Annual Monitoring Stations should be installed 2-4 feet out from the foundation and should be spaced 10-15ft apart but no more than 20ft between each station. Using a hand auger or auger shovel, you will dig holes the diameter as the station but should be dug 1-2 inches deeper to allow for water run off at the bottom of the station. Please view our How to Intall the Advanced Termite Bait System Video HERE and Trelona ATBS Annual Monitoring Installation and Service Guide for more information.