Product Q&A

« See More Q&A's

M from Pacifica writes

We had Termodor treatment done under our house foundation and aroind its perimeter...

A few days after Termidor treatment around the perimeter and under the foundation, we had a trench 5 feet deep dug up along the foundation walls to install a french drain. Does that mean that we dug out the Termidor and it will not be effective?

Answer:

Yes if the soil was disturbed, removed, or displaced after Termidor SC it could change effectiveness of barrier.

Answer last updated on: 05/02/2018

Was this answer helpful to you? Yes No

1 of 1 people found this answer helpful.