What is the procedure for drilling termite holes into post tension foundations?

Answer:

If your slab has already been poured and the tension applied, there is no drilling that needs to be done unless you have already poured a driveway/garage/sidewalk up to the side of the foundation. Once the slab has been poured, your termite protection will be to do a trench treatment like is explained in our guide How To Do a Termite Treatment, and shown in the video both on that page and the product page for the Termidor product you use to treat with.

Answer last updated on: 11/05/2013

Was this answer helpful to you? Yes No