Mike from Kingman, Az writes
There were no instructions if the recommended area has a 4" concrete slab. Do you core drill and place flush with the slab, or recess the core drill in the slab so that the top of the station is at ground level?
If you want to use the Advance Termite Bait System Kit in concrete, then you would core into the concrete, place the wood base and monitor directly into the hole, and then cover the hole using a concrete port cover.
Answer last updated on: 07/06/2022