Brett from Biloxi, Ms writes
My house has a stem wall or chain wall foundation in which 3 feet of brick veneer sits below the top of the grade or soil. What is the best method to trench the house to prevent termites? Would a standard 6 in by 6 in trench be appropriate or would it be better to trench down to the bottom of the brick veneer?
A standard 6 in by 6 in trench with Taurus SC Termiticide will be appropriate, if want to go deeper you can, as long as you don't go past the footer for the stem wall.
Â
Answer last updated on: 02/16/2023