Brett from Biloxi, Ms writes
My house has a stem wall or chain wall foundation in which 3 feet of brick veneer sits below the top of the grade or soil. What is the best method to trench the house to prevent termites? Would a standard 6 in by 6 in trench be appropriate or would it be better to trench down to the bottom of the brick veneer?
A standard 6 in by 6 in trench with Taurus SC Termiticide will be appropriate, if want to go deeper you can, as long as you don't go past the footer for the stem wall.
Answer last updated on: 02/16/2023