Product Q&A

« See More Q&A's

Laryy from Rushville, Il writes

How much Termidor SC do I apply to each hole in a cement block foundation a termite application?

Answer:

When treating a block foundation with Termidor SC, you should drill a hole in each void so there would be 2 holes per blockThe holes should be no more than 18 inches highUsually, you want to drill on the second row of blocks high from the groundIn addition to drilling the holes, you should also trench and treat the outside foundation wall and the inside foundation wall if you have a crawl spaceAfter drilling the holes, you are supposed to apply 2 gallons of solution per 10 lineal feet into the blocksFor filling trenches and drill holes going vertically into slabs, you should apply 4 gallons per 10 lineal feetPlease let us know if you have any further questions. Click on the link below for more information on treating termites. How To Perform A Termite Treatment

Answer last updated on: 07/09/2015

Was this answer helpful to you? Yes No

7 of 10 people found this answer helpful.

Termidor SC Termiticide/Insecticide

Termidor SC Termiticide/Insecticide

5 out of 5 stars

On Sale!
$69.98
Was: $79.98

Free Shipping*

You May Also Like