Channel Installation Instructions:
Ste 1 - Site Preparation
Prepare site to design profile and grade. Remove debris, rocks, clods, etc. Ground surface should be smooth prior to installation to ensure blanket remains in contact with slope.
Step 2 - Seeding
Seeding of site should be conducted to design requirements or to follow local or state seeding requirements as necessary.
Step 3 - Staple Selection
At a minimum, 6 in. long by 1 in. crown, 11 gauge staples are to be used top secure the blanket to the ground surface. Installation in rocky, sandy or other loose soil may require longer staples.
Step 4 - Excavate Anchor Trench and Secure Blanket
Excavate a trench along the top of the channel to secure the edges of the blanket. The trench should run along the length and width of the installation, be 6 in. wide and 6 in. deep. Staple blanket along bottom of trench, fill with with compacted soil, overlap blanket towards toe of slope and secure with row of staples.
Step 5 - Secure Body of Blanket
Roll blanket down slope from anchor trench. Staple body of blanket following the pattern. Leave end of blanket unstapled to allow for overlap. Place downstream blanket underneath upstream blanket to form shingle pattern. Staple seam and secure downstream blanket with stapling pattern. More staples may be required to ensure blanket is sufficiently secured to resist mowers and foot traffic and to ensure blanket is in contact with soil surface over the entire area of blanket. Further, critical points require additional staples.
Step 6 - Continue Along Slope - Complete Installation
Overlap adjacent blankets. Secure toe of slope using stapling pattern. Secure edges of installation by stapling at 1.5 ft. intervals along the terminal edge.